Asmaz Energy Communication Construction
Homepage Contact Türkçe

Homepage > Activities > Construction

Construction

 

AHŞAP KARKAS

Timber Engineering

Wood Building Engineering Systems with the turnkey solutions
• To Timber Buildings reinforced concrete structures of the more lenient and the earthquakes downfall risk. there is none.
• In America on earthquake as the measure reinforced concrete instead of to timber buildings be constructed.
• To Timber Buildings in contrast to reputed fire resistance against the concrete buildings.
• There is no way for error Wood constructions and material errors.
• To Timber Buildings can construct in a economic way with speed.
• To Timber Buildings can be designed as more then one story buildings.
• Made Of Wood linking the metal connector thanks to the earthquake resistance, provided quick and flawless construction. it is made All installation process very fast and easy to be a possible to render.
• Construction in the pipeline the great the savings are provided.
• Timber Structures life is very long.
• Timber Buildings nature friendly.
• No need to have a standard for Timber Buildings
• Can be design for any need, as big as wanted, as good as wanted.
• Timber Buildings are sanitary and isolated
To Timber Housing construction of the Radical Roof Stages Of Implementation
Floor Trusses
• Wood beams floor open network components electricity, water pipes and ventilation dirty water pipes and cold and hot air insulated pipes to quickly establish render possible trusses without any damage labor a fast provide complete. Only The System this function system even fast finish render possible, saving from labor expenses a great savings you can and more as a economic way to finish your building.
• Time and cost of the same time discounts, finalized the wood floor beams posi-truss® compared to 50% more lenient were to assembly and its easy to carry more.
• Engineering Also made factory calculations at millimeters produce treasured assembly on the spur of the moment length cutting your work much faster.
• POSI-TRUSS® 89x38 mm or 70x38mm solid timber were made of and standard on strained terms axle 61 were cm both against both the implementing a comfortable will be carried. So The both the pavement system and the ceiling system a complete time.
• POSI-TRUSS® pavement burden long distance wide areas in order to establish an ideal hall. 89 X 38 mm size solid wooden floor manufactured rafters manufacturing also American steel plate’s links used.
• All static accounts American software to the two types floor beam all around the world lightweight building systems in the wide the area of usage of the product. 89 X 38 mm solid wooden American steel plates connection using the beams of the depth equal is made of win that offer alternative a desirable product.

WALL Panels

Cut Out movable panel walls

• Wall panels, construction sector in the concrete, brick, briquette bins, aerated concrete, like the materials to be used for Industrial Pulling Off by using. For now for only internal partition wall and exterior wall insulation to ensure the coating materials produced. The Company is currently test production being the wall outside the soon to start production of.
• At Least at the time for more work be done to ensure. More work while the more the less people and energy utilization. 1 M2 around 21 kg is around 2 people a panel polyurethane foam easily can get together. 1 wall panel m2 made responsible for up m2 nearly 10 times, gas concrete made a wall 1 m2 responsible for up nearly 6 times more mild.
• Structure of gypsum plate and polished dash foam materials such as to be ready -10 due to +45 between is very polyurethane temperatures of application layer of foam made. Conditions of Season and whatever building continues. The Current materials when used the emerging additional insulation and costs and risks go away with the cost of the reduction.
• Heat, sound and humidity insulation within in the world in an adopted the best heat isolation of the polished dash thanks to the testimony the highest possible level. is to provide ( wall panels heat transmission coefficient k = ± 0,331 0,004 w/k m2 ( Pamukkale university. The result of Test) (tsek))
• Structures used in the interior walls feature of a flexible and, the pressure proof against practices durable. in fact that (1 M2 around 800 kg cannot broke.)
• Wall panel installations be asked for the return of displaced persons combination saw the space will be cut another place can be made assembly of the Other. Building materials such as debris pile formation.
• Wall thickness of the fixed and were windows because of the door and order for the assembly of the wall may be given without.
• Internal front connector used as foreign material with the wall a whole for the building complete pale cohesion for posed by the full a sound and heat insulation is provided.
Roof TRUSSES
• Engineering static calculations made roof trusses earthquake zone in our country in the building a very important factor of proposed interest. The World' of the earthquake areas of a roof structures to ease burdens and roof static test roof system in any cargo forces resistant to make the more a safe building to create, engineering account made of wood roof trusses in an atmosphere of The Plant in any static analysis made of different power and strength to design of a roof trusses mm as to make Us software and wire connection using plates.
• American static software manufacturing and assembly areas of the necessary a burden to (earthquake, storm, snow etc.) will answer all static data and integrated. In addition special design loads also this standard loads together the same design and scissor any cargo condition static according to the control of the to complete. American software this power, thanks to the roof trusses you made in the future turns that could have any option on load control according to the and the forces engineering period been designed in under the same roof confidence living have a chance to do.
• Factory produce construction of the area trusses assembly on the spur of the moment the other means also found out. Nm metric as tl made smooth place as mount. Booths are Doing Carpentry Work and it ceases when a only axle inter distance setup manner and complete roof assembly a day.